|
| The
Installation Process |
|

Distribute the sub base material evenly, except in the areas where you
desire extra depth, contour, and slope. With a yard rack, rack the sub
base material until you have contoured surface to match your desired
design. Use a shovel to move the large amounts of sub base material and
the flat side of a rack to smooth out any rough areas of the sub base.
All drainage will be off the top of the green and not through the green.
Drainage through the green would eventually deteriorate the packed sub
base. There must be a slight slope to the sub base for proper water
drainage.

|
|